Thursday, December 30, 2010
Fencing started
After 2 days of solid work from our brickies, our fence is about two thirds complete. It looks good, and progress has been fast. They'll only be working a half day new years eve, so my guess is that they won't finish it tomorrow. They are also bagging it, so with any luck, it'll be done early on after new year.
Wednesday, December 22, 2010
We're in
It's been a while since our last post. We've been in for a few weeks, and have had no net access. We've been busily getting quotes on fences, fly screens, blinds and other things that you don't really consider as much as you should when building.
We've had a fair bit of rain, which has tested the roof well, and unfortunately we had a failure in the garage, with water coming in through the roof. It seems to be some flashing that wasn't installed correctly. After this was fixed the first time, it again leaked in the next lot of rain we had. Hopefully we'lll get some more good rain to test the new fix out.
Our first fence quote came back at a whopping $29K. I nearly fainted. The second quote came back at 25K, which still seemed a little steep. Quote 3, which didn't include the wooden parts of the fence came in at just $9.5K. The wood part should be less than 5-6K, so it pays to shop around and get a few quotes. We should end up doing it for half the price of the first quote.
I'll post some pictures of the fence as it progresses. The footings are down, and thankfully no ruptured has or water lines in the digout.
We've had a fair bit of rain, which has tested the roof well, and unfortunately we had a failure in the garage, with water coming in through the roof. It seems to be some flashing that wasn't installed correctly. After this was fixed the first time, it again leaked in the next lot of rain we had. Hopefully we'lll get some more good rain to test the new fix out.
Our first fence quote came back at a whopping $29K. I nearly fainted. The second quote came back at 25K, which still seemed a little steep. Quote 3, which didn't include the wooden parts of the fence came in at just $9.5K. The wood part should be less than 5-6K, so it pays to shop around and get a few quotes. We should end up doing it for half the price of the first quote.
I'll post some pictures of the fence as it progresses. The footings are down, and thankfully no ruptured has or water lines in the digout.
Monday, November 15, 2010
Move in date, November 30th?
PCI done
We were hoping for a nice dry day for the pci today. Alas the dry weather didn't hold, and we found ourselves wading through the mud as we did the pci. We picked up the usual expected issues. Plenty of spots of paint to be touched up, a few scratches on the window frames. A few bricks that need to be replaced. Some Maroka finish that needs to be refinished, a few leaking pipes. Nothing too major at this point it seems. It's good to see the final, or near final product. We are pretty happy overall with the colour selection.
Friday, November 12, 2010
PCI booked for Monday
The finish line is in sight with the pci booked this Monday. Fingers crossed there will not be too much to do after that. We are hoping for a move in date of late November. The bagging has been finished on the balconies and at the front. When the landscaping has been done, I think it will look quite good.
Friday, October 29, 2010
Splash backs grouted and tiling nearly done
Thursday, October 28, 2010
Anyone know a good fencer in Western Sydney?
We received the first fence quote back today. I was a little shocked at the total figure. I can't imagine the cost of the great wall of China coming in at much more than that quote. I can't imagine that it is reasonable.
If anyone knows any good/reasonably priced fencers in Sydney's West, I'd be grateful for any recommendations.
I have posted a picture of the style that we need to meet the developer guidelines.
Saturday, October 23, 2010
Drive completed. Tiling has begun
We drove out past the block today, and a team of tilers were there, getting stuck into the floor tiles. I asked one of the tilers if they wouldn't mind snapping a few internal shots for me. Judging by the pictures, the floor tiles are progressing well. The backsplash tiles are all done bar the grouting.
The driveway is finished. It's a pretty neutral colour, so it'll just blend in nicely. I can also see from the pics that the electrical work looks to be completed. We have switches and power points.
Saturday, October 16, 2010
Door Colour
I'm guessing that this is the final front door colour. We picked it, but looking at it, I'm not convinced it looks that great. It's much whiter than i'd pictured. We'll have to wait and see what it looks like once the rest of the balconies are finished before we decide to go to Bunnings and buy a paint brush. I thought I'd cheat and photoshop the balconies to get us an idea of what the finished colours will look like. Still not convinced. I think I'd better check what time Bunnings shuts. I guess it's one of the limitations of deciding your colour selection with small sample swatches. It never quite looks how you'd pictured it.
Friday, October 15, 2010
Driveway Slab Layed
This week sees the driveway slab laid, and pavers delivered ready for the driveway paving. I could also see through the window that the balustrade has been stained.
It's a bit hard to see, but it looks like the painters may have done the final coat on the walls also.
The pavers aren't as light as I had feared. I think they will look ok.
Thursday, October 7, 2010
More internal shots
Site visit
I took the day off from work today to meet the site supervisor so that I could take a look around at the progress. It looks like our early November move in date is now officially looking more like a late November move in date. It's very unlikely we'll be in on time. A little disapointing on a 34 week build, but I guess a week or 2 isn't too bad. The tilers were in again today, finishing off the ensuite. The kitchen looks good, but the breakfast bar is the wrong type and will have to be pulled back out and swapped over. The first layer of paint is on. All conrnices are done. The bathroom cabinets are all in. It's really starting to look like a house.
Saturday, October 2, 2010
Kitchen and tiling
Good news. When we turned up at the block on Saturday, the tilers were there, busily working away. There was a team of about 5 of them, so, I'm expecting that the progress will be rapid. I managed to, with the assistance of my zoom, get a pretty decent, over the safety fence, shot of the kitchen. Looks like the cupboards and bench tops are in.
I also managed to get a picture over the back safety fence of the water tank. It's pretty big, but it seems to blend in pretty well, and it's well out of the way where it is.
Wednesday, September 29, 2010
Saturday, September 25, 2010
Balcony rails
Saturday, September 18, 2010
Garage Door
and more gyprock